







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Construction Before & After in Boulder City, NV
Seeing the work speaks louder than any claim we could make about it. Below are the kinds of transformations we take on in Boulder City – kitchens that stopped working for the family inside them, bathrooms held together by caulk and hope, whole homes stuck in a floor plan from another decade. Every project starts with a written price before any work begins, and every one carries our 365-Day Done Right Promise. Here’s what that looks like on the ground.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Recent Transformations
Kitchen Remodel: A 1970s Galley That Blocked the Whole House
Before
After
Before
AfterThe problem: a narrow galley kitchen hemmed in by a load-bearing wall, with cabinets from the original build and counters that offered no landing space near the range. No one could cook in it with another person in the room. What we did: worked with an engineer on the header to remove the dividing wall, rebuilt the layout with KraftMaid cabinetry and a Cambria quartz island, and pulled the permits as part of the job. The result: a room the family actually lives in now, with a real work triangle and seating that faces the living area. Kitchens like this one in Boulder City typically land between $32,000 and $58,000 depending on the cabinet line and stone selected – the written price we gave before the demo hammer swung didn’t move.
Bathroom Remodel: A Primary Bath Held Together by Silicone
Before
After
The problem: a primary bath where the shower pan had been patched repeatedly and the tile was letting water reach the wall behind it – the kind of slow failure common in Boulder City homes where the dry desert air hides moisture until the damage is well along. What we did: tore out the shower to the studs, replaced the rotted framing, and set a proper cement board substrate (the moisture-resistant layer behind your tile) before any waterproofing or tile went down. We installed Kohler fixtures and a curbless entry. The result: a bathroom that drains, dries, and holds, backed by our written guarantee.
Whole-Home Remodel: Replanning a 1,400-Square-Foot House Around How the Owners Actually Live


The problem: a home with a warren of small rooms, a hallway that served no purpose, and an exterior that had baked in the southern Nevada sun for decades. What we did: drew a new plan that folded the dead hallway into the living area, moved a doorway to fix the traffic flow, and re-sided the exterior in James Hardie fiber cement, which holds up to Boulder City’s heat and UV far better than the original wood. The result: a house that reads as one open, bright space instead of six cramped ones, with an exterior built for the climate. Whole-home remodels at this scope generally run $85,000 to $160,000 depending on how much plumbing and electrical move.
Kitchen Remodel: A Cabinet and Countertop Refresh Without the Tear-Down


The problem: a structurally sound kitchen with worn cabinet fronts, dated laminate counters, and lighting that left half the room in shadow – no need to move walls, but plenty that needed fixing. What we did: installed Wellborn cabinetry, set Silestone quartz counters, replaced the tired lighting, and swapped the faucet for a Moen fixture. The result: a kitchen that looks fully new without the cost and disruption of a full gut. Refreshes at this level usually run $18,000 to $30,000 and are a smart option when the plumbing and layout already work.
Bathroom Remodel: A Hall Bath That Served a Family of Five


The problem: one small hall bathroom shared by five people, with a single sink and a tub surround that had been patched more than once. What we did: reconfigured the vanity wall to fit a double sink, tiled the tub surround to the ceiling, and installed Grohe fixtures built to take daily use. The result: a bathroom that functions like a second primary bath for a family of five, at a written price that held from start to finish.
Whole-Home Remodel: Adding a True Primary Suite


The problem: a home where the primary bedroom shared a hall bath with the rest of the house, and no closet worth the name. What we did: carved space from an underused adjacent room to build an attached bath and walk-in closet, reran plumbing within the existing footprint, and finished the bath with Kohler and Moen fixtures. The result: a proper primary suite without a room addition, which kept the permit scope and the budget tighter than a bump-out would have. Finished on the number we wrote down before the first nail.
Want Results Like These?
If any of these projects sound like your house, the next step is simple: a written price before anything starts. Call (844) 834-9740 to talk through your kitchen, bathroom, or whole-home remodel in Boulder City and schedule your free estimate. A real person answers, every day and every hour. Every project carries our 365-Day Done Right Promise, and the price we quote is the price on the invoice.
Written by the team at Penhallow Remodeling Boulder City.
See the difference
Before
After
Before
After
Before
After


